PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Backfilling inside Stair -4 Facing North-East  (800x600).jpg Finished installing a manhole at Rahway Ave. Facing North-East (800x600).jpg Finished stripping all the bearing plate boxes and the platforms at Elev. 4-Stair -2 (4th Floor) Facing South.jpg Finished stripping the shear wall panels at Stair -4 (4th Floor) Facing South East (800x600).jpg Started stripping the shear wall panels at Stair -4 (4th Floor) Facing East (800x600).jpg
Previous page Started stripping the shear wall panels at Stair -4 (4th Floor) Facing East (800x600)
Started stripping the shear wall panels at Stair -4 (4th Floor) Facing East (800x600)